Largo,
MD
A large facility was constructed in Spring
2002 at a condominium complex. These photos show the progress of the
installation, through the final facility and some research work that we
are doing evaluating water quality improvement through the
facility.
Parking lot runoff is directed into the
facility at both ends, one through a curb cut and the other through an
inlet and outfall. The surface is predominantly mulch
|